Sølútîøñ ::-
Variables:
Production quantity of RA =X1
Production quantity of RB =X2
Production quantity of RC =X3
Objective:
To maximize Z = -2.05*X1+100.6*X2+40.85*X3
w.r.t. constraints-
15*X1+27.2*X2+17.1*X3 <= 390 (available time constrint)
20*X1+55*X2 <= 5000 (M1 availability constraint)
45*X1+100*X3+72*X4 <= 7500 (M2 availability constraint)
X1>=10(Demand constraint)
X2>=25 Demand constraint)
X3>=5 Demand constraint)
Modeling and solving in excel:
Formula setup:
solver setup :-
There is no optimal solution found as the time constraint is infeasible for producing the min required quantities of the products.
Please give POSITIVE rating if you understood the answer thank you.. please don't forget to UPVØTÉ 🙏🙏❤️❤️.